10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

The CAST exam has 110 questions and runs 1 hour 27 minutes.

These 10 free CAST questions are organized by exam domain, so you can see how each part of the Construction and Skilled Trades Selection System blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: Graphic Arithmetic 15% of exam

Question 1

During an authorized zone test, opening a normally closed door contact produces an alarm, but shorting the field cable pair leaves the zone secure. The panel recognizes 2.2 kΩ as secure and approximately 0 Ω as a wiring fault. Its 2.2 kΩ resistor is installed in series with the loop inside the panel cabinet. Which wiring correction restores supervision of a shorted field pair?

Show answer & explanation

Correct answer: C - Move the resistor to the protected end, in series with the door contact.

Domain 2: Mathematical Usage 16% of exam

Question 2

An alarm installation draws 0.25 A in standby and 1.60 A total in alarm. The design requires 24 hours of standby followed by 15 minutes in alarm, with a 1.25 sizing factor applied to the combined ampere-hour demand. All four battery sizes below are approved for the charger and cabinet. What is the smallest battery that meets this requirement?

Show answer & explanation

Correct answer: B - 9 Ah

Question 3

During testing in an empty showroom, a PIR detector repeatedly alarms when a radiant heater cycles on. The detector looks directly at the heater; its supply and tamper circuit test normally. A replacement detector of the same model behaves identically. What correction addresses this evidence while retaining intrusion coverage?

Show answer & explanation

Correct answer: D - Reposition the detector to exclude the heater and verify the protected area with a walk test.

Domain 3: Mechanical Concepts 40% of exam

Question 4

A fixed-position entrance camera gives a sharp, correctly exposed picture, but visitors occupy too little of the image for useful identification. The view includes substantial unused space on both sides of the doorway. With the camera position and image sensor unchanged, which adjustment directly increases the doorway's optical image size?

Show answer & explanation

Correct answer: A - Increase the lens focal length and refocus on the doorway.

Domain 4: Reading for Comprehension 29% of exam

Question 5

A transistor switches the return side of a 12 VDC relay coil. The manufacturer's circuit calls for a suppression diode to carry the coil's current when the transistor switches off. Where should that diode be connected?

Show answer & explanation

Correct answer: A - Across the coil, with its cathode at the positive terminal.

More CAST practice questions

Question 6

A new camera cable passes a simple pin-to-pin continuity test, yet its Ethernet connection is unreliable. Both ends have the same conductor order at pins 1 through 8: white/orange, orange, white/green, green, white/blue, blue, white/brown, brown. Which termination defect is present even though every pin connects to the same numbered pin at the other end?

Show answer & explanation

Correct answer: D - A split pair affecting the 3-6 and 4-5 pin groups

Question 7

A loss-of-power test leaves an electric strike locked against entry from outside. The inside lever still retracts the latch mechanically, and the door opens freely for exit. The approved hardware schedule specifies a fail-secure strike with independent mechanical egress. How should the technician document this result?

Show answer & explanation

Correct answer: B - Expected fail-secure operation with mechanical egress preserved

Question 8

An event log records this sequence: bell energizes, communicator restarts, network connection drops. Once the bell is running, a DC voltmeter shows the specified supply voltage at the communicator. Which test is most likely to capture the initiating fault?

Show answer & explanation

Correct answer: D - Capture the voltage at the communicator's power terminals with a triggered oscilloscope.

Question 9

A composite CCTV camera feeds a monitor, whose passive loop-through output continues over coaxial cable to a recorder. After the monitor is added, both images become dim. The camera is intended to drive one 75 Ω termination, but the monitor and recorder are each set to 75 Ω. Which configuration removes the loading error and correctly terminates the end of the line?

Show answer & explanation

Correct answer: C - Set the loop-through monitor to high impedance and leave the final recorder at 75 Ω.

Question 10

A 12.0 VDC supply powers a remote alarm device over two copper conductors, each 40 m long with a resistance of 0.025 Ω/m. The device draws 0.10 A in standby and 0.90 A in alarm, and requires at least 10.8 V at its terminals. Ignoring connector resistance, which alarm-state voltage and cabling decision are correct?

Show answer & explanation

Correct answer: B - 10.2 V; lower-resistance conductors are needed to meet the voltage requirement.

That's 10 of 1,030